Installation Process

See how easy and quick it is to enjoy a Pettit Fiberglass swimming pool

 

Step 1

Once the pool has been manufactured

in the factory, it is transported to the

location where all digging and

groundwork has been completed.

 

 

Step 2

The pool is then lowered into the

already excavated land, which

has been dug to engineering

standards.

 

Step 3

After backfilling the dirt and raising

the water level

in the pool, the pump and filter

are then connected usually

within 2 days.

 

 

 

 

Step 4

After necessary inspections, the deck

is poured and the screens

are erected while the water chemistry

is balanced. Normally within a

month, you can jump in.